It requires 5 8 gpm flow at.
14 concrete saw cut depth.
Boost productivity even in tight spaces with quick setup and automated operation.
A good rule of thumb is to cut the joints one quarter to one third the slab thickness.
For a 6 inch thick slab that means cutting 1 5 to 2 inches deep.
It requires 5 8 gpm flow at 2000 2500 psi oil pressure.
Diameter inches cutting depth diameter inches cutting 12 14 16 18 20 24 26 30 36 42 48 3 5 8.
Because a diamond chainsaw uses a guidebar with a long narrow flat surface the saw can.
A 3 x3 x3 chunk.
A 14 inch circular blade on a cut off saw is designed for a maximum depth of slightly less than five inches.
The s16 hydraulic circular saw has a 16 blade and a cutting depth of 6.
Matched with the appropriate blades the hilti wall saw system dst 10 ca gives you the capacity to make smooth precise cuts through concrete walls as thick as 14.
The reason for needing to know this is because you will want to take the depth of your slab and multiply it by 24 to 36.
We used an early cut saw to joint a concrete floor immediately after finishing.
Although the floor has no random cracks the engineer says we now have to chase the joints with a conventional saw so the cuts are 1 1 2 inches deep one quarter the slab thickness.
Ensure that the saw cut depth meets the structural engineering specifications.
The s14 runs at 4100 rpm with 8 gpm and 2500 psi input.
The s14 hydraulic circular saw has a 14 blade and a cutting depth of 5 1 4.
Diamond wheel shown sold separately.
That would be a 6 circular blade or a 3 chainsaw type saw.
You may have to cut an area larger than what you need jackhammer it out to the cut depth then cut again and maybe once more.
With the added benefit of a 14 cutting wheel it will handle cuts up to 4 9 inches in depth.
Cutting depth may vary depending on saw design.
This cut off machine backs up its larger cutting capacity with a ton of usability features.
To plan out where you are going to puts your cuts it is going to be important to know the depth of your concrete slab.
If the joint is too deep aggregate interlocking will not be sufficient to transfer loads.
The floor is 6 inches thick and the sawcut depth is 3 4 inch.
Remember you still have to get all that concrete out of there so you can t just expect them to cut a nice rectangle then pick it up.